Heritage, Vintage, Laminated asphalt shingles phillipsburg, ks – TAMKO HERITAGE VINTAGE User Manual
Page 3: Continued from page 2)

Central District
220 West 4th St., Joplin, MO 64801
800-641-4691
09/14
Northeast District
4500 Tamko Dr., Frederick, MD 21701
800-368-2055
Southeast District
2300 35th St., Tuscaloosa, AL 35401
800-228-2656
Southwest District
7910 S. Central Exp., Dallas, TX 75216
800-443-1834
Western District
5300 East 43rd Ave., Denver, CO 80216
800-530-8868
Visit Our Web Site at
tamko.com
HERITAGE
®
VINTAGE
®
LAMINATED ASPHALT SHINGLES
Phillipsburg, KS
3
SHINGLE APPLICATION FOR LEFT TO RIGHT INSTALLATION:
IMPORTANT: USE
ALIGNMENT NOTCHES TO START SHINGLE COURSES, DO NOT MEASURE IT.
STEP 5
STEP 4
STEP 3
STEP 2
STEP 1
LEFT RAKE
EDGE
Eave – or first course going into valley or into hip ridge
STARTER COURSES
5
th
COURSE repeat step 1 – 4
2
ND
LAYER IS VINTAGE STARTER
ALIGNMENT
NOTCH 2
ST
1 STARTER LAYER
NOTCH 1
ALIGNMENT
ALIGNMENT
NOTCH 1
After establishing the 4 course shingle pattern continue up the rake in as many rows as
necessary using the same formula as outlined below. Cut pieces may be used to complete
courses at the right side roof edge. As you work across the roof, install full size shingles taking
care to align the exposure notches to maintain the correct offsets. Shingle joints should be no
closer than 4”.
Fourth Course: Align the fourth course shingle's right side exposure notch with "Notch 1"
located at the top of the third course shingle. Cut the appropriate excess amount overhanging off the left rake edge.
Extend the fourth course by installing additional full shingles before starting fifth course.
Third Course: Align the third course shingle's right side exposure notch with "Notch 2" located at the top of the
second course shingle. Cut the appropriate excess amount overhanging off the left rake edge. Extend the
third course by installing additional full shingles before starting fourth course.
Second Course: Align the second course shingle's right side exposure notch with "Notch 1"
located at the top of the first course shingle. Cut the appropriate excess amount overhanging off
the left rake edge so the overhang is 1/4” to 3/8” if drip edge flashing is not used along the eaves or
rakes. If drip edge flashing is present, install shingles even with the drip edge. Extend the second
course by installing additional full shingles before starting third course.
First Course: Start the first course at the left rake edge with a full size shingle and overhang
the rake edge 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes.
If drip edge flashing is present, install shingles even with the drip edge. Extend the first
course by installing additional full shingles along the eave before starting second course.
RIGHT RAKE
EDGE
Eave – or first course going into valley or into hip ridge
STARTER COURSES
2
nd
Layer is Vintage Starter
STEP 5
STEP 4
STEP 3
STEP 2
STEP 1
1
st
Starter Layer
5
th
COURSE repeat step 1 – 4
ALIGNMENT
NOTCH 1
ALIGNMENT
NOTCH 2
After establishing the 4 course shingle pattern continue up the rake in as many rows as
necessary using the same formula as outlined below. Cut pieces may be used to complete
courses at the left side roof edge. As you work across the roof, install full size shingles taking
care to align the exposure notches to maintain the correct offsets. Shingle joints should be no
closer than 4”.
Fourth Course: Align the fourth course shingle's right side exposure notch with "Notch 1" located
at the top of the third course full shingle at rake edge. To fill in the right rake edge, take a full
shingle, align left side and cut the appropriate shingle amount to fill in to the right rake edge
with an overhang of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing
is present, install shingles even with the drip edge. Extend the fourth course by installing additional shingles before
starting fifth course
Third Course: Align the third course shingle's right side exposure notch with "Notch 2"
located at the top of the second course shingle. To fill in the right rake edge, take a full
shingle, align left side and cut the appropriate shingle amount to fill in to the right
rake edge with an overhang of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes.
If drip edge flashing is present, install shingles even with the drip edge.
Extend the third course by installing additional full shingles before starting fourth course.
Second Course: Align the second course shingle's right side exposure notch with "Notch 1"
located at the top of the first course shingle. To fill in the right rake edge, take a full shingle,
align left side and cut the appropriate shingle amount to fill in to the right rake edge with
an overhanging of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing
is present, install shingles even with the drip edge.
Extend the second course by installing additional full shingles before starting third course.
First Course: Start the first course at the right rake edge with a full size shingle and
overhang the rake edge 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing
is present, install shingles even with the drip edge. Extend the first course by installing additional full shingles
along the eave before starting second course.
ALIGNMENT
NOTCH 1
SHINGLE APPLICATION FOR RIGHT TO LEFT INSTALLATION:
IMPORTANT: USE
ALIGNMENT NOTCHES TO START SHINGLE COURSES, DO NOT MEASURE IT.
(CONTINUED from page 2)
(Continued)