beautypg.com

Heritage, Vintage, Laminated asphalt shingles phillipsburg, ks – TAMKO HERITAGE VINTAGE User Manual

Page 3: Continued from page 2)

background image

Central District

220 West 4th St., Joplin, MO 64801

800-641-4691

09/14

Northeast District

4500 Tamko Dr., Frederick, MD 21701

800-368-2055

Southeast District

2300 35th St., Tuscaloosa, AL 35401

800-228-2656

Southwest District

7910 S. Central Exp., Dallas, TX 75216

800-443-1834

Western District

5300 East 43rd Ave., Denver, CO 80216

800-530-8868

Visit Our Web Site at

tamko.com

HERITAGE

®

VINTAGE

®

LAMINATED ASPHALT SHINGLES
Phillipsburg, KS

3

SHINGLE APPLICATION FOR LEFT TO RIGHT INSTALLATION:
IMPORTANT: USE

ALIGNMENT NOTCHES TO START SHINGLE COURSES, DO NOT MEASURE IT.

STEP 5

STEP 4

STEP 3

STEP 2

STEP 1

LEFT RAKE

EDGE

Eave – or first course going into valley or into hip ridge

STARTER COURSES

5

th

COURSE repeat step 1 – 4

2

ND

LAYER IS VINTAGE STARTER

ALIGNMENT

NOTCH 2

ST

1 STARTER LAYER

NOTCH 1

ALIGNMENT

ALIGNMENT

NOTCH 1

After establishing the 4 course shingle pattern continue up the rake in as many rows as

necessary using the same formula as outlined below. Cut pieces may be used to complete

courses at the right side roof edge. As you work across the roof, install full size shingles taking

care to align the exposure notches to maintain the correct offsets. Shingle joints should be no

closer than 4”.

Fourth Course: Align the fourth course shingle's right side exposure notch with "Notch 1"

located at the top of the third course shingle. Cut the appropriate excess amount overhanging off the left rake edge.

Extend the fourth course by installing additional full shingles before starting fifth course.

Third Course: Align the third course shingle's right side exposure notch with "Notch 2" located at the top of the

second course shingle. Cut the appropriate excess amount overhanging off the left rake edge. Extend the

third course by installing additional full shingles before starting fourth course.

Second Course: Align the second course shingle's right side exposure notch with "Notch 1"

located at the top of the first course shingle. Cut the appropriate excess amount overhanging off

the left rake edge so the overhang is 1/4” to 3/8” if drip edge flashing is not used along the eaves or

rakes. If drip edge flashing is present, install shingles even with the drip edge. Extend the second

course by installing additional full shingles before starting third course.

First Course: Start the first course at the left rake edge with a full size shingle and overhang

the rake edge 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes.

If drip edge flashing is present, install shingles even with the drip edge. Extend the first

course by installing additional full shingles along the eave before starting second course.

RIGHT RAKE

EDGE

Eave – or first course going into valley or into hip ridge

STARTER COURSES

2

nd

Layer is Vintage Starter

STEP 5

STEP 4

STEP 3

STEP 2

STEP 1

1

st

Starter Layer

5

th

COURSE repeat step 1 – 4

ALIGNMENT

NOTCH 1

ALIGNMENT

NOTCH 2

After establishing the 4 course shingle pattern continue up the rake in as many rows as

necessary using the same formula as outlined below. Cut pieces may be used to complete

courses at the left side roof edge. As you work across the roof, install full size shingles taking

care to align the exposure notches to maintain the correct offsets. Shingle joints should be no

closer than 4”.
Fourth Course: Align the fourth course shingle's right side exposure notch with "Notch 1" located

at the top of the third course full shingle at rake edge. To fill in the right rake edge, take a full

shingle, align left side and cut the appropriate shingle amount to fill in to the right rake edge

with an overhang of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing

is present, install shingles even with the drip edge. Extend the fourth course by installing additional shingles before

starting fifth course
Third Course: Align the third course shingle's right side exposure notch with "Notch 2"

located at the top of the second course shingle. To fill in the right rake edge, take a full

shingle, align left side and cut the appropriate shingle amount to fill in to the right

rake edge with an overhang of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes.

If drip edge flashing is present, install shingles even with the drip edge.

Extend the third course by installing additional full shingles before starting fourth course.

Second Course: Align the second course shingle's right side exposure notch with "Notch 1"

located at the top of the first course shingle. To fill in the right rake edge, take a full shingle,

align left side and cut the appropriate shingle amount to fill in to the right rake edge with

an overhanging of 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing

is present, install shingles even with the drip edge.

Extend the second course by installing additional full shingles before starting third course.
First Course: Start the first course at the right rake edge with a full size shingle and

overhang the rake edge 1/4” to 3/8” if drip edge flashing is not used along the eaves or rakes. If drip edge flashing

is present, install shingles even with the drip edge. Extend the first course by installing additional full shingles

along the eave before starting second course.

ALIGNMENT

NOTCH 1

SHINGLE APPLICATION FOR RIGHT TO LEFT INSTALLATION:
IMPORTANT: USE

ALIGNMENT NOTCHES TO START SHINGLE COURSES, DO NOT MEASURE IT.