A. Remove the two bolts holding the small cast-

ing located just above the oil filter

B. Using engine oil on the threads, install 1/8"

NPT to #4 90° fitting into the supplied oil feed

adapter.

C. Using the adapter, the appropriate supplied

gasket and the supplied 6mm screws, assem-

ble the components as shown in Fig. 4-a.

D. Temporarily cover one end of the oil feed line

and protect it from debris until connecting it to

the supercharger.

E.

Connect the open end of oil feed line to the

installed fitting. Route line along oil pan rail

towards the front of the engine. Use tie wraps

to secure the line and protect it from kinking,

abrasion, and high heat areas.

4. OIL FEED LINE INSTALLATION

Fig. 4-a

OIL PAN RAIL

9/16” THRU

.40"

DRIVER’S SIDE

OF OIL PAN

.40"

VIEW OF OIL DRAIN HOLE LOCATION LOOKING

AT FRONT DRIVER’S SIDE OF OIL PAN

(DIMENSIONS TO CENTER OF HOLE)

Fig. 3-c

Fig. 3-b

Apply a small amount of silicone sealer to the

new threads. Apply more sealer to the 3/8"

NPT nipple, elbow and hose barb and secure

in hole. Make sure seal is formed all around

the fitting. Install elbow and barb fitting point-

ing up and towards the driver side frame rail.

(See Fig. 3-b.)

F.

Temporarily cover oil drain barb fitting to keep

out debris.

G. Drain the engine oil, install a new filter and

refill with fresh oil.

H. Re-attach the steering rack and ball joints.

I.

Re-install the engine cooling fans if they were

previously removed.