Vortech 1993-1996 5.2L Grand Cherokee User Manual
Page 23
15. PLENUM AND DISCHARGE INSTALLATION
THROTTLE
BODY
SIDE VIEW
(2) 1/4" WASHERS
FACTORY
AIR CLEANER
MOUNTING STUD
17
A. Remove the tab holding down the
factory air cleaner mounting stud. Use
the two (2) supplied 1/4" washers as
spacers underneath the mounting stud
tab. Reattach the assembly to the
throttle body. (See graphic.)
B. Place the gasket and plenum onto the
throttle body. Secure with plenum nut.
C. Fit the 3" x 2" silicone sleeve onto the
plenum and slide on the two #48 clamps.
D. Slide the 2-3/4" x 2" sleeve onto the
supercharger discharge. Secure with
#44 clamps.
E. Install the discharge tube between the
plenum and supercharger and secure
with clamps.
16. BYPASS VALVE INSTALLATION
A. Slide the 1" x 3-1/2" hose onto the
bypass valve. Secure with #16 hose
clamps. (See the graphic on the next
page.)
B. Slide the 1" x 2-1/2" hose onto the
discharge duct and bypass valve inlet.
Secure with hose clamps.
C. Route the 5/32" vacuum line to the
bypass valve and FMU tee as shown in
the graphic on the next page.
D. Using the supplied tee and length of
hose, cut the hose 4" from the FMU.
E. Install the tee fitting and connect the
hose to the bypass valve.