beautypg.com

Dynasty Spas Deluxe System D-1000 User Manual

Page 8

background image

Getting Ready For Delivery & Set-up Of Your New Spa

Surface And Pad Requirements

Balconies And Deck Requirements

Access & Clearance

Electrical Requirements

Wiring Requirements

Your new portable spa must be placed on a uniformly firm, flat, and level

surface. A concrete pad 4 inches thick is best.

Your spa requires up to 40" of clearance through gates between house

and side fences, and up to 8.5' overhead clearance depending on the size

of the unit.

Your 110 Volt spa pack requires an isolated (no other appliances or lights

on this circuit at any time) 110 Volt, 20 amp circuit breaker cords maximum

length 15 ft.
Your 220 Volt spa pack will require a 50 amp dedicated GFCI circuit

breaker, depending on model.

4 Wire #6 Gauge wire over 50 ft.

2-Hots, 1-Neutral, 1-Isolated

Ground

The clearance required to turn a corner can be equal to the length of the

spa.
All debris blocking access to the job site, must be removed prior

to delivery. Any trimming of trees or bushes, removal of debris, leveling

of ground or other general maintenance must be done prior to

delivery and is the responsibility of the customer.

Decking must be constructed to support 85 pounds per square foot.
Balconies must be constructed to meet current state and local codes.
Gates must be self closing and self-latching.

If your spa is located near sprinklers, adjust or cap them so as not to

hit the siding of the spa.

S e t - u p & D e l i v e r y G u i d e l i n e s

4 Wire #8 Gauge wire under 50 ft.

2-Hots, 1-Neutral, 1-Isolated

Ground

8

This manual is related to the following products: