C a u t i o n, Activity island assembly instructions – RAVE Sports Activity Island w/ EZ Up II Board Platform User Manual
Page 9

9
C A U T I O N
DO NOT USE AN AIR COMPRESSOR TO INFLATE THIS
PRODUCT. USE OF AN AIR COMPRESSOR MAY CAUSE
OVER-INFLATION, WHICH CAN DAMAGE OR RUPTURE
SEAMS, THUS VOIDING THE WARRANTY.
DO NOT EXCEED 2.5 PSI INFLATION PRESSURE.
IMPORTANT:
It is normal for the air pressure within air filled tubes
to fluctuate depending on air and water temperatures.
It may be necessary to increase or decrease the air
pressure in your product accordingly. To avoid damage
on extremely hot days it may be necessary to check and
release the air pressure from your product throughout
the day.
ACTIVITY ISLAND ASSEMBLY INSTRUCTIONS
Step 1
Unroll the inflatable island on a
flat surface with the graphics face
up. Make sure there are no sharp
objects under the product that
might puncture the material.
Step 2
Locate the two valves. Make sure both valves are closed
before filling. See inflation and valve operation on p. 8.
Inflate Island completely till firm.
!!