RAVE Sports Activity Island w/ EZ Up II Board Platform User Manual
Page 12
12
How to Connect the Boarding
Platform to Activity Island
Step 1
Before inflating the Boarding
Platform, lay the inflatable on a flat
surface. Make sure there are no
sharp objects under the product that might puncture the
material.
Step 2
Locate the valve and start inflating. See inflation and valve
operations on page 8. Inflate tube until it is firm like a
basketball.
Step 3
Float Boarding Platform up to the
side of the Activity Island. Feed
the end of one strap through the
ring on the bottom side of the
Boarding Platform and through
the corresponding ring on the
bottom side of the Island.
Step 4
Feed strap through the middle opening of the buckle and
then feed it through the bottom opening.