beautypg.com

Dip switch settings for dual gates, Step 26, May not function correctly – Mighty Mule FM702 User Manual

Page 26: Learn, Dip switches

background image

22

DIP Switch Settings for Dual Gates

Step 26

The four control board DIP switches match the openers
with the type of gate on which they are installed. For
example, a dual gate may pull-to-open or push-to-open.
Prior to packaging, the Mighty Mule Gate Opener

®

control board was configured for a single swing gate that
pulls-to-open
(opens into the property). You must adjust
the DIP switches so the control board will recognize and
activate both openers. The DIP switches must also be
adjusted to control the order in which your dual gate
leaves open and close ("gate sequencing"). If you do not
adjust the DIP switches, your Mighty Mule Gate
Opener

®

may not function correctly.

RED

BLK

ORG

BLU

GRN

CLS EDG

OPN EDG

RED

GRN

ORG

BLU

WHT

BLK

ORG

BLU

GRN

CLS EDG

OPN EDG

LEARN

AUTOCLOSE

INERTIA

STATUS

PULL/PUSH

SNGL/DUAL

SEQ1
SEQ2

MIN

MAX

MIN

MAX

OFF

60

120

BATT

+

OBSTRUCT
SENS.

RCVR

R B

G

ALARM

SECOND OPERATOR

FIRST OPERATOR

POWER IN

18VAC SOLAR
~ ~ – +

ACCESSORY

PWR. SW.

1234

ON

OBSTRUCT

SENS.

PULL/PUSH

SEQ1

SNGL/DUAL

SEQ2

LEARN

DIP switches

MIN

MAX

NOTE: To change the DIP switch settings, you must turn the control box power switch OFF;

move the switch; then turn the power back ON. Use a small screwdriver to move the switches.

PULL/PUSH: Set to PULL for swing gates that pull-to-open [factory setting]; PUSH for swing gates that push-to-open (see
Push to Open Installation on page 32). NOTE: The direction a gate opens is determined by standing inside the fenced
property and facing toward the gate.

SNGL/DUAL: Set to SNGL for a single gate leaf [factory setting]; DUAL
for dual gate leaves.

Move this DIP switch to DUAL (see illustration at right). If this DIP switch
is set to SNGL, the opener connected to the SECOND OPERATOR
terminal block will not function.

SEQ1: Controls the order of operation for dual gate leaves.
(the factory setting is OFF).
SEQ2: Controls the order of operation for dual gate leaves.
(the factory setting is OFF).

You determined the opening and closing order of your gate leaves when you mounted the positive stop plates on your gate.
Review the Installation of the Positive Stops section on page 17 before setting the SEQ1 and SEQ2 DIP switches.

PLEASE NOTE: The terms "FIRST OPERATOR" and "SECOND OPERATOR"

refer to a unit wired to the terminal block of the same name.