Install PVC conduit (not included) needed for power cables and low voltage wiring – see illustration
below. The SL-2000B and SL-2200B power cable and safety edge (required) wiring should be run
through PVC conduit underneath the driveway.
Chain
Roller Guard
Roller Guard
(REQUIRED)
(REQUIRED)
(REQUIRED)
PVC Conduit for
second operator
power cable.
Roller Guard
(REQUIRED)
Chain Bracket
Chain Bracket
PVC Conduit for
second operator
power cable.
Chain
Contact Sensor
Roller Guard
Receiver
(cable in separate
conduit)
Roller Guard
First Operator
Contact Sensor
Contact Sensor
Contact Sensor
Contact Sensor
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
PVC Conduit for
power cable.
Run up to 1000' of low
voltage wire to control
box from transformer
(wire not included).
120 Volt Indoor
Transformer
(Surge Protector
not supplied)
Roller Guard
(REQUIRED)
Chain Bracket
Chain Bracket
Chain Bracket
First Gate Operator
(Control Unit)
Second Gate Operator
(Auxiliary Unit)
1. KEEP CLEAR! Gate may move at any time.
2. Do not allow children to operate gate or
play in gate area.
3. This gate is for vehicles only. Pedestrians
must use a separate entrance.
Moving Gate Can Cause
Injury Or Death
WARNING
!
1. KEEP CLEAR! Gate may move at any time.
2. Do not allow children to operate gate or
play in gate area.
3. This gate is for vehicles only. Pedestrians
must use a separate entrance.
Moving Gate Can Cause
Injury Or Death
WARNING
!
Second Operator
Contact Sensor
PREPARING THE GATES