Venting and Combustion Air Installation

Category IV Vent Termination Clearances

Maintain the following clearances to the vent
termination:

-

At least 6 feet from adjacent walls

-

No closer than 5 feet below roof over-
hangs

-

At least 7 feet above any public walk-
ways

-

At least 3 feet above any forced air
intake (does not include the combustion
air inlet) within 10 feet.

-

The vent termination must be at least 4
feet from any electric meters, gas
meter-regulators, relief valves or other
equipment. Never terminate the vent
above or below any of these items with-
in 4 feet.

-

Vent must terminate at least 12 inches
above grade or common snow line.

In those applications in which the vent
termination is below the projected snow
line. The installer has 2 options. In the
first option the vent system can be rout-
ed vertically through an insulated chase
or “riser box” and then terminated hori-
zontally. The chase is to be constructed
and insulated by the contractor, main-
taining clearances for vertical and hori-
zontal enclosures. In the second option
the installer can use the horizontal con-
centric snorket kit, see Fig. 22B page 34.

If the venting application is a horizontal
direct vent:

-

Must maintain 12-inch clearances
below and horizontally from doors and
windows. See dimension A Fig. 17.

If the venting application is a horizontal
non-direct vent:

NOTICE

Fig.17: Termination of Vent system

Dimension A

Direct Vent - 12 inches

Non-Direct Vent - 4 feet