6 installation preparation – Glow-worm EnergySaverCombi 100 User Manual
Page 14
14
221854B
6.5 Pre Plumbing
The wall mounting jig can now be pre-plumbed without the
boiler being mounted if necessary. All water, gas and electric
connections are on the wall mounting jig with the exception of
the condense drain, the position of which is shown on the wall
template for pre plumbing purposes. See sections 9 and 10 for
details of gas, water, condensate and electrical connections.
6.6 Unpacking of Boiler Carton
Cut the straps that secure the carton and the boiler to its transit
pallet and open the top flaps of the carton. Carefully remove the
top packing piece which contains the user control door and
place to one side until required. Remove the carton and edge
packing. To assist in lifting the boiler it is advisable to remove the
casing door by removing the two securing screws.
6.7 Optional Mini Expansion Vessel
As an option a mini expansion vessel can be fitted to the
domestic pipework as shown in diagram 6.3.
For ease of installation the vessel should be fitted to the boiler
prior to it being lifted to the wall.
Remove the right hand casing panel of the boiler as described
in section 12.7.
Remove the 1/2" plug fitted into the domestic pipework.
Fit the mini expansion vessel using a suitable thread sealant to
make a water tight seal.
2.5˚
Inclined
Horizontal
Extended flue length
Standard flue length
Diagram 6.1
Diagram 6.2
6511
6525
WALL
TEMPLATE
WALL PLUG
(2 OFF)
WASHER
(2 OFF)
SCREW
N
o
12 x
50mm
(2 OFF)
WALL PLUG
(2 OFF)
SCREW N
o
12 x 50mm
(2 OFF)
WALL
TEMPLATE
EXTENDED SIDE FLUE
BOILER MOUNTING
HANGING
BRACKET
WALL
MOUNTING JIG
208
Ø 125
6 Installation Preparation
Diagram 6.3
9068
MINI
EXPANSION
VESSEL
1/
2 " PLUG
REMOVED
90
0