Planning, Trenching, Plowing – Ditch Witch RT120 User Manual
Page 75: Drilling, Rt120 operator’s manual
Operation Overview - 74
RT120 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 78.
2.
3.
Classify jobsite. See page 80.
4.
Select chain and teeth to match your soil type, if necessary. See page 148
5.
Check supplies and prepare equipment. See page 82.
6.
Haul equipment to jobsite. See page 96.
Trenching
1.
2.
Position tractor and controls. See page 103.
3.
Begin trenching. See page 104.
4.
Engage cruise control if desired. See page 146.
5.
Complete the installation. See page 151.
6.
Shut down tractor. See page 88.
Plowing
1.
2.
Position tractor and controls. See page 110.
•
•
coordinated plowing - page 117
•
3.
4.
5.
Engage cruise control if desired. See page 146.
6.
Complete the installation. See page 151.
7.
Shut down tractor. See page 88.
Drilling
1.
2.
Dig approach trench and target trench. See page 131.
3.