Setup, Rt120 operator’s manual – Ditch Witch RT120 User Manual
Page 125
Backhoe - 124
RT120 Operator’s Manual
Setup
CMW
Setup
1.
Move attachment speed/direction control to neutral position.
2.
Move ground drive control to neutral position.
3.
Move ground drive gear selector to low.
4.
Lower rear attachment to 6” (150 mm) above ground.
5.
Check that backfill blade, if equipped is straight and lower it to ground.
6.
Decrease engine speed to low throttle.
7.
Move to backhoe operator’s station.
8.
Lower stabilizers enough to lift front tires.
9.
Remove swing lock pin from hole (1) and
store in hole (2).
10. Raise boom to release tension on stow
lock.
11. Release stow lock by pushing handle
forward.
12. Adjust engine speed to 1/2 to 3/4 throttle
for digging.
IMPORTANT: For more information about stabilizer controls, see 64.
IMPORTANT: For more information
about stow lock, see page 67.
NOTICE: Engine speed affects
speed of backhoe operation.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)