Mv800 operator’s manual – Ditch Witch MV800 User Manual
Page 52
MV800 Operator’s Manual
Vacuum and Pothole - 51
Unload to Another Tank
CMW
®
5.
Move valve handle counterclockwise to engage “reverse flow” mode and start engine. Material will flow
into offboard tank.
6.
Increase throttle as desired to transfer material.
7.
When transfer is complete, throttle down completely and turn off engine. Close vac tank drain/outlet
valve.
8.
Close offboard tank inlet valve and disconnect hose from offboard tank inlet valve.
9.
Move handle clockwise to “vacuum” mode and turn on engine.
10. Open vac tank drain/outlet valve. Material will empty from transfer hose.
11. Close vac tank drain/outlet valve, throttle down and turn off engine.
12. Disconnect transfer hose from vac tank.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)