Prepare jobsite, Prepare excavation point, Ge 34 – Ditch Witch MV800 User Manual
Page 35: Mv800 operator’s manual
Prepare - 34
MV800 Operator’s Manual
Prepare Jobsite
CMW
®
Prepare Jobsite
Prepare Excavation Point
•
Clear the area to be excavated. Remove rocks or branches too large for vacuum hose.
•
If excavating fluids while drill string is moving, clear area of trees, shrubs, and weeds.
•
Select a solid area to stand on while excavating.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
274-050
To help avoid injury:
•
Classify jobsite as electric if jobsite classification is in question or if the possibility of unmarked
electric utilities exists.
•
Expose lines by hand before digging.Cutting high voltage cable can cause electrocution.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)