beautypg.com

Alwarerc ALware Quad Flyer Spider 500 ( Kit Only ) User Manual

Page 27

background image

Step 89.

Battery installation method 2: under the
Spider 500X body.

Step 90.

Add some lubricating oil or grease on each
troughs on both of the two Central Frames
for each Spider Arms.

Step 91.

Please pay attention: The first time to
fold the Spider Arms of Spider 500X
request specific technique and patient.
First, hold the Spider Arm 2 and 3(with
same LED color) of the Spider 500X and
move your hands thus the Spider Arms will
rotate according to the arrow's direction for
4-5 times. (If it is too hard to move, adjust
the tightness of the M2x6 Hex Cap Screws
secured onto the Hex Alu Rods installed on
the Spider Arm.)
Repeat the same action for
the other pair of Spider Arm 1 and 4.

Step 92.

Second, rotate Spider Arm 4 in clockwise
direction then push the Arm upwards
according to the arrow's direction by thumb.
(If it is too hard to move, adjust the tightness
of the M2x6 Hex Cap Screws secured onto
the Hex Alu Rods installed on the Spider
Arm.)

www.alwarerc.com