Alwarerc ALware Quad Flyer Spider 500 ( Kit Only ) User Manual
Page 20
![background image](/manuals/733725/20/background.png)
Step 61.
Repeat step 54-60 to install the LED light
system to the rest of the Spider Arm Sets.
Next, fix the wires onto the Central Frame
with Taps. The direction of the wires should
be placed as same as the photo shown
above.
Step 62.
Prepare 4x Tension Spring 0.6x4.9x22mm,
2x M2x6 Hex Cap Screws and 2x M2 Nuts.
Step 63.
Hook the Tension Spring to the Spider Arm
Frame which is next to the trough of the
Central Frame. (Remarks: the hooking
direction is unique and important.)
Step 64.
Insert the M2x6 Hex Cap Screw onto the
hole of Central Frame(with red circle) and
hook the other end of the Tension Spring to
the screw.