beautypg.com

3 install a new nudam to a existing network – ADLINK ND-6060 User Manual

Page 57

background image

Initializtion & Installation

• 49

2.3

Install a New NuDAM to a Existing Network

2.3.1

Equipments for Install a New Module

A existing NuDAM network

New NuDAM modules.

Power supply (+10 to +30 V

DC

)

2.3.2

Installing Procedures

1.

Configure the new NuDAM module according to the initialization
procedure in section 2.2.

2.

The baud rate and check-sum status of the new module must be
identity with the existing RS-485 network. The address ID must not
be conflict with other NuDAM modules on the network.

3.

Power off the NuDAM power supply of the existing RS-485 network.

4.

Power off the host computer.

5.

Wire the power lines for the new NuDAM with the existing network.
Be careful about the signal polarity as wiring.

6.

Wire the RS-485 data lines for the new NuDAM with the existing
network. Be careful about the signal polarity as wiring.

7.

Wire to the input or output devices. Refer to section 2.4 for
illustrations.

8.

Power on the host computer.

9.

Power on the NuDAM local power supply.

10. Use the NuDAM administration utility to check entire network.