beautypg.com

A. c, 18 series installation - separate units, Back to back installation – Delta 48313 User Manual

Page 7

background image

18 Series Installation - Separate Units

2

Cartridge Installation

A.

C.

Turn off water supplies. Remove
cover (1), bonnet nut (2) and test cap (3)
from the body. If this is not a thin wall

mounting, the entire plasterguard (4) may

be removed. If screen (5) is in place,

remove before installing cartridge.

B.

Insert adapter assembly (1) into valve

body. Make sure the adapter assembly

is correctly positioned and is pressed all

the way down inside body. Secure adapter

with the screw (2) provided in the adapter

assembly. Remove the retainer (3) from

the adapter.

For back to back or reverse installations

(hot on right and cold on left): Rotate

cartridge (1) so the words “HOT SIDE” (2)

appear on the right. Install the cartridge

making sure that the key is fully engaged

with the slot in the brass body (See step C).

Slide bonnet nut (3) over the cartridge and

thread onto the body. Hand tighten securely.

Back to back Installation

Rotate cartridge (1) so the words

“HOT SIDE” (2) appear on the left. Insert

cartridge assembly into valve body.

Make sure the key (3) on the cartridge is

fully engaged with the slot in the brass

body (4). Slide bonnet nut (5) over the

cartridge and thread onto the body.

Hand tighten securely.

1

2

3

1

1

3

4

Reverse

Installation

Cold

Hot

1

5

5

2

3

3

4

Normal Installation

(changes not required)

2

2

5