beautypg.com

Carrier 38BYG User Manual

Page 8

background image

NOTE:

When charging is necessary during heating season,

charge must be weighed in accordance with unit rating plate ± 0.6
oz/ft of 3/8-in. liquid line above or below 15 ft respectively.

EXAMPLE:

To calculate additional charge required for a 25–ft line set:

25 ft – 15 ft = 10 ft X 0.6 oz/ft = 6 oz of additional charge

Step 15—Final Checks

IMPORTANT:

Before leaving job, be sure to do the following:

1. Securely fasten all panels and covers.

2. Tighten service valve-stem caps to 1/12-turn past finger-tight.

3. Leave User’s Manual with owner. Explain system operation

and periodic maintenance requirements outlined in manual.

4. Fill out Dealer Installation Checklist and place in customer

file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible equip-
ment failure, periodic maintenance must be performed on this
equipment.

Frequency of maintenance may vary depending upon geographic
areas, such as coastal applications.

Copyright 2002 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231

38byc3si

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1

4

Tab

5a 5a

PC 101

Catalog No. 533-80078

Printed in U.S.A.

Form 38BYC-3SI

Pg 8

11-02

Replaces: 38BYC-2SI

This manual is related to the following products: