Shift lever installation, Note, Handle panel installation – MTD 215-386-000 User Manual
Page 6
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
4. Shift Lever Installation
The shift lever is mounted to the handle panel in
the following manner.
A.
Place the top hole of the shift lever over weld
------- bolt on handle panel. See figure 7.
B Place belleville washer (F) and spring (G) over
weld bolt as shown in figure 7.
C. Secure with hex lock nut (H). See figure 7.
NOTE
Thighten hex lock nut just to the
point the spring starts to compress.
FIGURE 7.
5. Handle Panel Installation
Thread adjustment ferrule (D) on end of control
rod. Hook the other end of control rod into the tab
on idler arm. Secure with hairpin cotter (C). See
-figure
8
.
Slip other end of control rod with ferrule attached
through the slot in handle panel. Then slide the
handle assembly down over the handle mount
-brackets on the chassis. See figure 9.
- 113-890-033 (8 pages)
- 246-685-000 (16 pages)
- 110-420R000 (19 pages)
- 112-516R000 (16 pages)
- 111-902-026 (14 pages)
- 112-530 (10 pages)
- CC4025 (88 pages)
- 112-120-120 (12 pages)
- 215-035-000 (16 pages)
- Y26SS (56 pages)
- Y780 (56 pages)
- 24665-9 (12 pages)
- CC4125 / CC4175 (48 pages)
- 114-062-000 (19 pages)
- 218-405-000 (23 pages)
- 110-902-033 (4 pages)
- 219-406-000 (24 pages)
- 241687 (12 pages)
- 219-381-000 (24 pages)
- 112-011-300 (12 pages)
- TMO-33603B (16 pages)
- 675 thru 689 (12 pages)
- 110-122A (14 pages)
- 16K (44 pages)
- CC4105 (56 pages)
- 112-892-033 (7 pages)
- 243-675A (16 pages)
- 197-468A (6 pages)
- 24687-8 (16 pages)
- 110-300 (4 pages)
- 114-040A (8 pages)
- E660G (28 pages)
- 240677 (18 pages)
- Y700 (64 pages)
- 242-660-000 (8 pages)
- 11-094R000 (16 pages)
- 110-516R000 (20 pages)
- 25P (50 pages)
- 113-030A000 thru 113032D000 (16 pages)
- Y725 (68 pages)
- Y765 (64 pages)
- 244-600A (7 pages)
- YARD MACHINES 599 (54 pages)
- 24687L (16 pages)
- 10710-0 (11 pages)