4 : I n s t a l l a t i o n P r o c e d u r e s
CHRISTIE DIGITAL SYSTEMS
4-5
August 7, 2003
4 . 2 . 4 . M
O U N T I N G T H E
P
R O J E C T O R
The SLC Console includes a standard projector mounting bracket for Christie P35 projectors.
If any other model projector is to be mounted, contact the Christie factory.
1. Mount projector on projector mounting bracket (Item 13 in Figure A-2).
2. Ensure that projector is level and in line with console before tightening mounting bolts.
3. Verify that all four (4) bolts are installed and securely tightened.
4.3. E
L E C T R I C A L
C
O N N E C T I O N S
SLC Consoles are factory wired and tested. All functions have been carefully tested and
calibrated to prevent problems during installation and operation.
WARNING
Turn off all breakers at the building AC power distribution panel
before connecting the console.
4 . 3 . 1 . V
E R I F Y
V
O L T A G E
Check the AC voltage shown on the console nameplates. Then measure the AC supply
voltages with a voltmeter. Verify that the measured voltages do not differ by more than 10%
from the rated nominal values of the unit.
4 . 3 . 2 . W
I R I N G
H
O O K
- U
P
1. Pull 3-phase wires and single-phase and ground wires through one of knock-out holes
located on front side on foot of console. Check charts in Figure 4-4 and Figure 4-5 for
correct wire size.
WARNING
Grounding wire (green) must be at least as large in diameter as largest
wire used for AC power connections.
2. Connect 3-phase wires to Terminal Board TB2–L1, TB2–L2, and TB2–L3.
3. Connect single-phase wires to TB2–L1, Neutral, marked 115V single-phase. Connect
ground wire to TB2–ground.
4. Check Schematic and/or Automation Manual for wiring hook-up to TB5. These
connections are for projector, sound, changeover douser, and auditorium functions.
5. Hook up all wires as required in above instructions.