Assembly, Checklist – Sears 917.25049 User Manual
Page 10
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

ASSEMBLY
/CHECKLIST
BEFORE YOU OPERATE AND ENJOY YOUR NEW
TRACTOR, WE WISH TO ASSURE THAT YOU RECEIVE
THE BEST PERFORMANCE AND SATISFACTION FROM
THIS QUALITY PRODUCT
PLEASE REVIEW THE FOLLOWING CHECKLIST:
/
/
/
All assembly insttuctions have been completed.
No remaining loose parts in carton.
Battery is properly prepared and charged. (Minimum
1 hour at 6 amps).
Seat is adjusted comfortably and tightened securely.
/
/
/ Be sure mower deck is properly leveled side-to-side/
front-to-rear for best cutting results. (Tires must be
properly inflated for leveling).
/ Check mower and drive belts. Be sure they are routed
properly around pulleys and inside all belt keepers.
/ Check wiring. See that all connections are still secure
and wires are properly damped.
/ Before driving tractor, be sure freewheel control is in
drive position.
WHILE LEARNING HOWTO USE YOUR TRACTOR, PAY
EXTRA ATTENTION TO THE FOLLOWING IMPORTANT
ITEMS:
/ Engine oil is at proper level,
/ Fuel tank is filled with fresh, dean, regular unleaded
gasoline.
/ Become familiar with all controls - their location and
function. Operate them before you start the engine.
/ Be sure brake system is In safe operating condition.
/ It is important to purge the transmission before operat
ing your tractor for the first time. Follow proper starting
and transmission purging instructions (See “TO START
ENGINE" and "PURGE TRANSMISSION" in Opera
tion section of this manual).
10