beautypg.com

Vertical (through the roof) vent assembly – Vermont Casting 820 User Manual

Page 18

background image

18

18

Vermont Castings Jefferson Direct Vent/Natural Vent Gas Heater

20002191

This installation will require you to first determine the
roof pitch and use the appropriate vent components.
Refer to Figures 8 and 9 on pages 8 and 9.

1. Locate the final position of the stove, observing all

clearances for both the vent and the stove.

2. Plumb to the center of the inner (4”) flue collar from

the ceiling above, and mark that location.

3. Cut the opening:

CFM System: 9

³⁄₈

” x 9

³⁄₈

” (240mm x 240mm)

DuraVent System: 10” x 10” (254mm x
254mm)

4. Plumb any additional opening through the roof or

other construction that may be needed. In all cases,
the opening must provide a minimum of 1” (25mm)
clearance to the vent pipe.

5. Place the stove in its final position.

6. Install firestop(s) #7DVFS and Attic Insulation Shield

#7DVAIS as needed. (Fig. 30) If there is a room
above ceiling level, a firestop must be installed on
both the bottom and top sides of the ceiling joists. If
an attic is above ceiling level, an attic insulation
shield must be installed.

Recessed Wall

Sheet Metal
Screws and
Bracket

Wall Screws
and Anchors

Waterproof Seal
Around Pipe

ST219

Fig. 29 Use extension brackets to mount snorkel against
recessed wall.

Firestop

Finishing
Collar

7” Pipe

Wall Plate

Waterproof Seal
Around Pipe

Firestop

Window Well

Drain

4” Clearance

Snorkel
Termination
Cap

Wall Screws
and Anchors

ST218

Gravel

Fig. 28 Snorkel kit installation.

Vertical (Through the Roof)

Vent Assembly

Note that all vertically terminated installations must
include the restrictor plate included with the stove.
Refer to Figure 8, Page 8.

Make certain the vent system conforms to all other
requirements for vertical termination as specified on
Page 8.

#7DVAIS
Attic Insulation
Shield

#7DVFS
Firestop in
Upper Floor

#7DVFS
Firestop in
Ceiling

Use Four
8d Nails

ST222

Fig. 30 Install firestops and attic insulation shield.

7. Install the appropriate roof support and flashing,

making certain that the upper flange of the flashing
base is below the shingles. (Fig. 31)

8. Install appropriate pipe sections until the vent run

reaches above the flashing. The enlarged ends of
the vent sections always face downward.

This manual is related to the following products: