beautypg.com

Installation step 12, Fasten door bracket, Sectional door installation procedure – Chamberlain 2000SDC 1/2HP User Manual

Page 20: Figure 1 figure 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Installation Step 12
Fasten Door Bracket

Follow instructions which apply to your door type

as illustrated below or on page 21.

To prevent damage to steel, aluminum, fiberglass or

glass panel doors, always reinforce the inside of the door

both vertically and horizontally with an angle iron.

A horizontal brace should be long enough to be secured to 2 vertical supports. A vertical brace should cover the

height of the top panel.

The illustration shows one piece of angle iron as the horizontal brace. For the vertical brace, 2 pieces of angle iron

are used to create a U-shaped support. The best solution is to check with your garage door manufacturer for an

opener installation door reinforcement kit.

SECTIONAL Door Installation Procedure

hkxi lorin I 4 rd

V

O'tiOi I r«i rVOTGCfn «rt

b rioedKl f o r q t n q a dcor»

dMintYjn,

ibMt,

dcoTi vrith44» p4Ti9l,

«14

Figure 1

Figure 2

• Center the door bracket on the previously marked

vertical guideline used for the header bracket

installation. Note the correct UP placement, as

stamped inside the bracket.

• Position the bracket on the face of the door within the

following limits:

A) The top edge of the bracket 2-4" below the top edge

of the door.

B) The top edge of the bracket directly below any

structural support across the top of the door.

• Mark and drill 5/16" left and right fastening holes.

Secure the bracket as shown in Figure 1 if there is

vertical reinforcement.

If your installation doesn't require vertical reinforcement
but does need top and bottom fastening holes for the door
bracket, fasten as shown in Figure 2.

20

This manual is related to the following products: