General view basic setups, General view basic setups cvc 2, Ready to start – VACUUBRAND CVC 2II User Manual
Page 9
page 9 of 36
Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 997835 / 15/12/2009
setting pressure unit (mbar / Torr / hPa)
configuration of the cooling water valve if applicable
automatic identification of the solenoid operated isolation valve
setting basic setup
ready to
start
basic setup ”Standard”
(factory-set)
controller switches
-
solenoid operated isolation valve (indispensable)
-
cooling water valve (optional)
basic setup ”Management”*
controller switches
-
pump
-
solenoid operated isolation valve if connected
-
cooling water valve (optional)
basic setup ”VACUU•LAN”*
controller switches
-
pump according to preset pressure and time
values
-
solenoid operated isolation valve if connected
* only in combination with Vacuum-Management-
System VMS Module A
basic setup ”Management
Plus”*
controller switches
-
pump, but with after-running to pump out condensate
-
solenoid operated isolation valve (indispensable)
-
cooling water valve (optional)
General view basic setups
CVC 2
II