Reznor R6GN Option - Installation - Horizontal Roof Curb (559542) User Manual
Installation instructions

INSTALLATION INSTRUCTIONS
MODEL 559542
HORIZONTAL ROOF CURB USED WITH R6GN 150/180 UNITS
INSTALLATION
INSTRUCTIONS
FORM# 121D-0109
U.S. PATENT 5148647
This Roof Curb is NRCA approved and is constructed of 16 gauge galvanized steel with a full perimeter 2" x 4" wood nailer
strip. The curb is designed to be used with the Cooling, Gas Electric, and Heat Pump Models. The curb is shipped with the
following parts, See Figure 2:
Step 2:
Layout the curb pieces before assembly to insure that all the necessary pieces are included.
Step 1:
Curb Package is shown as shipped with easy to identify part numbers on all sides. Cut shipping bands and remove all
parts to verify parts to above list.
(A)
(B)
Fig ure 1
Fig ure 2
(D)
(E)
2 ea.
Curb Long Sides - 94 ½" Long (A)
1 ea.
Curb Short Sides -77
3
8
" Long (B)
1 ea.
Curb Long Side w/ Duct Opening -77
3
8
" Long (C)
2 ea.
Condensor Pans - 74 x 18
5
8
" (D)
2 ea.
Condensor Pans - 74 x 16
3
8
" (E)
1 ea.
Hardware Package Includes:
4 ea. "Hinge" Pins
3
16
"
18 ea. Hex Washers screws #10 x ½"
3 ea.
Gasket ¾" x 1 ¼" x 14' (42 ft. total)
(A)
(C)
(E)
(D)
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)