beautypg.com

Reznor UDBP Option - Installation - Power Venting User Manual

Page 8

background image

Form I-UD-V-PV, Page 8

3.7 Vent Terminal (cont’d)

Commercial/Industrial Installation

Models UDAP and UDBP - ALL Sizes

FIGURE 3 - Horizontal Vent Terminal - Commercial/Industrial Installation

(

NOTE: Read all measurements; drawing is not proportional.)

TABLE 6 - Horizontal Vent

Terminal Clearances

A Reznor

®

Option CC1 vent cap is

required. Maintain a clearance of 6 to

12 inches (152-305mm) from the wall

to the vent terminal cap for stability

under wind conditions.
Products of combustion can cause

discoloration of some building

finishes and deterioration of masonry

materials. Applying a clear silicone

sealant that is normally used to

protect concrete driveways can protect

masonry materials. If discoloration is

an esthetic problem, relocate the vent

or install a vertical vent.

Structure

Minimum Clearances for Vent

Termination Location (all

directions unless specified)

Forced air inlet within 10 ft (3.1M)

3 ft (0.9M) above

Combustion air inlet of another

appliance

6 ft (1.8M)

Door, window, or gravity air inlet

(any building opening)

4 ft (1.2M) horizontally

4 ft (1.2M) below

1 ft (305mm) above

Electric meter, gas meter*, gas

regulator*,

U.S. - 4 ft (1.2M) horizontally

Gas regulator *

U.S. - 3 ft (0.9M)

Adjoining building or parapet

6 ft (1.8M)

Adjacent public walkways

7 ft (2.1M) above

Grade (ground level)

1 ft (305mm) above**

*Do not terminate the vent directly above a gas meter or service

regulator.

** Consider local snow depth conditions. The vent must be at least 6”

(152mm) higher than anticipated snow depth.

Approved clearance thimble is required when flue pipe extends through combustible

materials. Follow the requirements of the thimble and/or the vent pipe manufacturer.

Pitch flue pipe down

toward outlet 1/4” per foot

for condensate drainage.

(NOTE: Slope applies to

entire horizontal vent run.)

6” to 12”

(152 to 305 mm)

Wall

Roof or Building Overhang

3 ft (1M)

minimum

6 ft (1.8M) minimum

Reznor (Option CC1)

or Equivalent Vent

Cap - note positions

of vent cap openings

(shaded areas)

Parapet or

Adjoining Building

Double-Wall* Vent Pipe

Vent Pipe

(Comply

with Re-

quirements

in 3.1 & 3.2

on page 6.)

*Follow the instructions in Addendum Section A, page 10,

to join a double-wall vent terminal section to a single-wall

vent run and to the vent cap.

6” (152mm) minimum

3. Venting Requirements and Instructions - Commercial/Industrial Installation

- applies to ALL Sizes of Models UDAP and UDBP (cont’d)

This manual is related to the following products: