beautypg.com

Masonry construction – Perfect Aire PNC18000 User Manual

Page 15

background image

14

Install Cabinet

to 3/8

3 4 plus trim

thickness

/

1 Long Wood

Screw

Wooden

Strip

Support

Bracket

of Window Mounting.

firmly on bottom board of wooden frame.

removal. (See Fig. 5.)

4. Secure bottom rail to wooden frame with two large wood

screws 1" (2.5 cm) long using the two holes in the

bottom of the channel resting on frame. (See Fig. 6.)

support brackets. A wooden strip nailed to the outside wall

should be used in conjunction with sill support angle

brackets. (See Fig. 7.)

5. Screw or nail cabinet wooden frame using shims, if

,

Remember to maintain proper slope as described in Step 3.

in Step 8 of Window Mounting.

NOTE: See Fig. 11 of Window Mounting

NOTE: After installing, make sure the air conditioner is tilted 3-4º to the outside to allow water drainage and

perfect cooling efficiency.

openings around top and sides of cabinet, and all sides

of wood sleeve to the opening.

Instructions for bottom rail seal location.

MASONRY CONSTRUCTION

1. Cut or build a wall opening in the masonry wall

similar to the frame construction (refer to Step 2

of Thru-The-Wall Installation for wall thickness

greater than 8-1/2").

2. Secure cabinet in place using masonry nails or

the right masonry anchor screws. (Another way

to do this is to build an in-between frame of

2x4's as shown in Step 2 of Thru-The-Wall

Installation but make it double framed on either

side and install between masonry wall opening

and cabinet. Frame must be securely anchored

to masonry wall opening.) This way gives very

good louver clearance on either side of cabinet.

3. Install a lintel to support masonry wall above

cabinet. Existing holes in cabinet can be used

and/or additional holes can be drilled to fasten

cabinet at various positions. Be sure that side

louver clearance is in accordance with Step 1

of Masonry Construction.

4. Install exterior cabinet support brackets as

shown in Step 2 of Thru-The-Wall Installation.

Caulk or flash if needed to provide a weather-

tight seal around top and sides of cabinet.

5. To complete installation, apply wood trim

moulding around room side projection of cabinet.

Fig. 6

Fig. 5

Fig. 7

Fig. 8

(See Fig. 8.)