beautypg.com

Installation instructions (continued) – Perfect Aire PNC12000 User Manual

Page 12

background image

11

INSTALLATION INSTRUCTIONS (CONTINUED)

PREPARE THE WINDOW

1

3/4 (or 1/2 )

Screws

(7)

Lock Frame

(2)

Sash Lock

(1)

Mounting Hardware

Window sash

seal foam

(1)

PREPARE AIR CONDITIONER

2

C: Align the hole in the top rail with those in the

top of the unit as shown in Fig.B

D: Secure the top rail to the unit with the 3/8"

screws as shown in Fig.C.

NOTE: For safety reasons, all four(4) screws

MUST be securely fastened.

INSTALL THE ACCORDION PANELS

3

NOTE: Top rail and sliding panels on each side

are offset to provide the proper pitch of 5/16" to

the rear. This is necessary for proper condensed

water utilization and drainage. If you are not

using the side panels for any reason, this pitch to

the rear must be maintained.

A.Place unit on floor, a bench

or a table. Hold the

accordion panel in one

hand and gently pull back

the center to fill the

open end. See Fig.1.

Fig.1

Lower sash must open sufficiently to allow a clear

vertical opening (H) of the following size. (See

Table 1 below.) Side louvers and the rear of the AC

must have clear air space to allow enough airflow

through the condenser for heat removal. The rear

of the unit must be outdoors, not inside a building

or garage.

A: Remove the air conditioner from the carton and

place on a flat surface.

NOTE: The top rail hardware and Fig. A, Fig. B,

and Fig. C are not applicable to the units

10,000 BTU/h or greater. For models less than

10,000 BTU/h, the top rail must be assembled.

B:

Remove top rail from the rear of the packaging

material as shown in Fig. A.

Packaging

Fig. A

Top Rail

Fig.B

Fig.C

Top Rail Hardware

3/8" Screws

(4)

Top Rail

(1)

or

or

Model

Size (H)

5000~8000 Btu/h 10000~12000 Btu/h

14” (356 mm)

15-1/2” (394 mm)

Table 1

This manual is related to the following products: