beautypg.com

2 valve module – NORAC UC5-BC-HG07 User Manual

Page 21

background image



18

8.2

Valve Module

1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin

Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up.

Figure 15: Valve Module

2. Verify the valve coil connectors are oriented vertically (Figure 16).

Figure 16: Align Coils

3. Place the valve module between the valve coils. Slide a valve mounting bracket over the

connectors of the valve module and the valve coil connectors. This may require flexing the
plastic bracket slightly (Figure 17).

4. Ensure the bracket is pushed over the connectors far enough to allow the clips to engage

behind the valve connectors.

Output Number Normal Function

1

Left Up

2

Left Down

3

Right Up

4

Right Down

5

Main Up

6

Main Down

7

Boom Lock

8

Option 4