5 electrical installation – NORAC UC4+BC+MS User Manual
Page 17
14
4.5 E
LECTRICAL
I
NSTALLATION
Figure 20: Cable Configurations: Rear
of Sprayer
1. Route C11 to the rear of the sprayer,
in the vicinity of the valve block.
2. Connect the 6-pin Tower on the valve
cable (C03) to the mating 6-pin Shroud
on C11
3. Install the Deutsch connectors from
C03 onto each NORAC valve as shown
in Figure 21.
4. The connectors on the valve cable
(C03) are marked RIGHT UP, LEFT
UP, RIGHT DOWN and LEFT
DOWN. Cables labeled with UP go
on the same side as the hydraulic hoses.
5. Connect cable C02B to the 4-pin AMP
plug on C11 and to the roll sensors.
6. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B.
7. Route the sensor branch cable (C02) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
Figure 21:– Valve Cable Connections
Figure 22: Cable Configurations:
Sensors
8. Cable-tie the installed cables every 12
inches.
9. Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and folding boom
movement.