beautypg.com

NORAC UC4+BC+HG User Manual

Page 22

background image

19

9.

Connect cable C03 to the valve

extension cable (C04).

10.

Connect the 2-pin connectors on C03 to

the NORAC valve block.

Depending on the valve block part
number,

the

“UP”

and

“DOWN”

connectors will be on opposite sides of the
block.

11. The connectors on the valve cable (C03)

are marked RIGHT UP, LEFT UP,
RIGHT DOWN and LEFT DOWN.

Cables labeled with DOWN go on the

same side as the hydraulic hoses on the
44933D block.

Cables labeled with UP go on the same

side as the hydraulic hoses on the
44963D block.

44933D

44963D

Figure 24 – Valve Cable Connections

12.

Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.