NORAC UC4+BC+HG User Manual
Page 11
8
4
INSTALLATION PROCEDURE
4.1 W
ING
S
ENSOR
I
NSTALLATION
1. Assemble
the
Breakaway
Sensor
Mounting Brackets (B11) as show in
Figure 4 and Figure 5.
Figure 4 – Breakaway Sensor Bracket
Exploded View
Figure 5 – Breakaway Sensor Mounting
Bracket Assembly
To assemble the breakaway sensor
bracket:
a) Assemble the bolt and nut into the
collar.
b) Grease the bottom edge of the collar
and the angled tube of the base.
c) Place the collar onto the angled tube
of the mounting base.
d) Install the spring between the collar
and the upper ring of the base.
e) Insert tube through assembly and
tighten the collar
2. Mount the sensor bracket onto the boom.
If possible, mount the sensor
brackets while the booms are in
their folded position to ensure that
they
will
not
interfere
with
anything when the boom is folded
for transport.
3. The sensor mounting brackets can be
installed on the 45 degree tube using the
provided adapter plate (B16). Then
attach B13 directly to B16.
Mounting the sensor bracket to
the break-away section of the
boom may cause the boom to drop
suddenly as a break-away occurs.
This will occur on break-away
sections which lift as they break
away.
For optimal boom tip protection, it
is recommended that the sensor be
mounted within approximately
two feet (60cm) of the boom tip.
Please refer to the UC4+ Spray Height
Control system warranty at the end of
the UC4+ Spray Height Control
Operator’s
Manual
(M01)
for
implications.
4. Mount the NORAC UC4+ ultrasonic
sensor (E02) into the sensor brackets.