beautypg.com

NORAC UC4+BC+HG User Manual

Page 11

background image

8

4

INSTALLATION PROCEDURE

4.1 W

ING

S

ENSOR

I

NSTALLATION

1. Assemble

the

Breakaway

Sensor

Mounting Brackets (B11) as show in
Figure 4 and Figure 5.

Figure 4 – Breakaway Sensor Bracket

Exploded View

Figure 5 – Breakaway Sensor Mounting

Bracket Assembly

To assemble the breakaway sensor
bracket:

a) Assemble the bolt and nut into the

collar.

b) Grease the bottom edge of the collar

and the angled tube of the base.

c) Place the collar onto the angled tube

of the mounting base.

d) Install the spring between the collar

and the upper ring of the base.

e) Insert tube through assembly and

tighten the collar

2. Mount the sensor bracket onto the boom.

If possible, mount the sensor

brackets while the booms are in
their folded position to ensure that
they

will

not

interfere

with

anything when the boom is folded
for transport.

3. The sensor mounting brackets can be

installed on the 45 degree tube using the
provided adapter plate (B16). Then
attach B13 directly to B16.

Mounting the sensor bracket to

the break-away section of the
boom may cause the boom to drop
suddenly as a break-away occurs.
This will occur on break-away
sections which lift as they break
away.

For optimal boom tip protection, it

is recommended that the sensor be
mounted within approximately
two feet (60cm) of the boom tip.

Please refer to the UC4+ Spray Height
Control system warranty at the end of
the UC4+ Spray Height Control
Operator’s

Manual

(M01)

for

implications.

4. Mount the NORAC UC4+ ultrasonic

sensor (E02) into the sensor brackets.