5 completing the factoryinstall – NORAC UC4+BC+FT1 User Manual
Page 20
17
4.5 C
OMPLETING THE
F
ACTORY
I
NSTALL
1. Test the functionality of the original
manufacturer’s boom controls. The
NORAC Control Panel (Item E01)
does not need to be powered up for
the original switches to function.
Unfold the booms and raise/lower each
boom and main section. Confirm that
the cabling/hoses are agreeable to the
entire range of motion. If one or more
of these functions do not work, review
the hydraulic and electrical portions of
this manual to check for proper
installation.
2. Unfold the booms and level to 90 cm
(or 35 inch) nozzle height. At this point
ensure the UC4 sensors are reading
from an adequate and uniform target,
such as gravel or dirt, or concrete.
3. By using the “Quick Install” feature of
the UC4+ panel, the system may be
configured in preparation for the End-
User. However, a hydraulic “ReTune”
procedure will be required for optimal
performance. This is required to tune
the UC4+ hydraulic parameters to
those of the End-User tractor hydraulic
system.
4. To perform the “Quick Install”
procedure, select the FT1 sprayer type.
However, rather than toggling “YES” to
select the FT1 type, hold the toggle
switch towards “YES” (for several
seconds) until the word “SENSOR”
appears on the UC4+ panel screen.
5. The UC4+ control panel will then
prompt the installer to “EXIT CAB
AND PUSH BOOM TIP DOWN
TO GROUND”. When exiting the
cab and approaching the boom, avoid
walking near the sensors as this may
result in measurement error.
6. At this point the UC4 panel should
display the Main Operating Screen:
M 90 M
(example)
7. This indicates the system is ready for
the second stage of installation. This will
be carried by the end user (for the
reasons as described previously in Step
3).