beautypg.com

NORAC UC4+BC+FT1 User Manual

Page 19

background image

16

7. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug (P4) on C11.

8. Route the CAN Node cable (C02B) to

the roll sensors. Follow existing cables
and/or hydraulic lines.

9. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B.

10. Route the sensor branch cable (C02) to

the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.

11. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

Figure 18: Cable Configurations: C02, C02B and C11