beautypg.com

4 electrical installation – NORAC UC4+BC+FT1 User Manual

Page 18

background image

15

4.4 E

LECTRICAL

I

NSTALLATION

Figure 16: Cable Configurations: Rear of the sprayer

1. Route C11 to the rear of the sprayer,

in the vicinity of the valve block. Note
that the 16-pin AMP plug (P16)
provides the hitch connection.

2. Connect the 3-pin Shroud (S3) on the

wing interface cable (C13) to the
mating 3-pin Tower (T3) on C11.

3. Connect the 6-pin Shroud (S6) on the

main interface cable (C12) to the
mating 6-pin Tower (T6A) on C11.

4. Route the free ends of C13 and C12 to

the existing valve block and insert all of
the Deutsch tees between the matching
valve connections. For each tee, the
function is labeled on the branch wire.

It is recommended to connect

P2C and R2C (Bypass) on C13 to
the existing valve block even
though it is not used.

5. Connect the 6-pin Tower on the valve

cable (C03) to the mating 6-pin Shroud
(S6A) on C11.

6. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT

DOWN. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 17: Valve Cable Connections