NORAC UC4+BC+NT4 User Manual
Page 27
23
Figure 26: Valve Cable Connections
16. Disconnect the four metri-pack
connectors for the boom tilt cylinders
from the Nitro valve block and connect
them to their respective connectors on
cable C15. Use Table 6 to match the
connectors together.
Table 6: Boom Tilt Functions
Sprayer
Connector
Function
NORAC
Connection
BM17
Left Boom UP
S2A
BM16
Left Boom DOWN
S2B
BM 15
Right Boom UP
S2C
BM14
Right Boom DOWN
S2D
Each metri-pack connector on
C15 is marked with its function.
17. Connect the Roll Sensor Cable (C02B)
to the 4 pin AMP plug on C15.
18. Route the free end of the Roll Sensor
cable (C02B) to the boom frame roll
sensor (E03).
19. Connect the other free end of cable
C02B to the extension cable C06.
20. Route cable C06 to the chassis roll
sensor
21. Connect the sensor branch cable (C02)
to the free connector on cable C02B.
22. Route the sensor branch cable (C02) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
23. Cable-tie the installed cables every 12
inches.
Provide enough slack in all cables
to account for the movement of
the main section, parallel lift, and
FOLDING boom movement.
24. Screw the cover plates (B17 and B18)
onto the access plate (B16) to seal the
cab.