beautypg.com

4 main lift sensor installation – NORAC UC4+BC+NT4 User Manual

Page 16

background image

12

4.4 M

AIN

L

IFT

S

ENSOR

I

NSTALLATION

1. Mount the main lift sensor with the

bracket provided (B11). The sensor
should point behind the boom, but be
ahead of the spray nozzles.

Make sure the sensor has

clearance when the main section
is raised and lowered.

2. Aim the sensor perpendicular to the

ground. Tighten all the sensor bracket
bolts.

General mounting rules for ultrasonic
main lift sensor:

a) Mount the sensor at the midpoint of the

main lift section.

b) The sensor must have a 12-inch

diameter clear view of the ground
without any obstructions.

c) Ensure that there will be no contact

between the sensor and the booms
when folding and unfolding, or raising
and lowering.

d) The bottom of the sensor must be at

least 9 inches in front of the spray
nozzles.

e) The bottom of the sensor must be at

least 9 inches above the spray nozzles.