beautypg.com

NORAC UC4+BC+JD7A User Manual

Page 34

background image

31

Figure 40: Cable Configurations: C10, C01, C04 and C70

2. Connect the UC4+ power cable (C10) and

sensor trunk cable (C01) to the UC4+
Control Panel (E01) (see Figure 40).

Ensure the UC4+ Control Panel’s

power is OFF for the remaining
installation. (Bottom of switch
pressed IN).

3. Plug the 3-pin connector on C10 into the

cab’s power bar.

4. Route the free ends of C10 and C01 along

the side of the cab post and under the floor

mat.

Figure 41: Hole under Floor Mat

5. Plug the 2 pin tower on C10 into the 2 pin

shroud on the roll bias cable (C70).

6. Plug in the 6-pin Tower on C10 to the 6-pin

Shroud on the valve extension cable (C04).

C04 and C70 come with one

connector unassembled to allow the
cables to be run through a hole in the
floor under the steering column. To
assemble these connectors, refer to
the drawings in Section 5.4 and 5.7.
The pins require a special tool to
remove if an error is made.

The cables may also be routed

through the rear window of the cab.

7. Route the free ends of C01, C04 and C70

to the rear of the sprayer near the sprayer
valve block. Run the cables along the
sprayer frame with the JD harness.

The hole in the floor may be covered

by a plate, or a grommet may be
installed in the hole. They can be
reinstalled after the wiring is
complete. NORAC supplies a
grommet (M13) for the hole if one
does not exist.