COMPLETING THE FACTORY INSTALLATION
1. Test the functionality of the original manufacturer’s boom controls. Power to the NORAC control
panel does not need to on be for the sprayer controls to function. Unfold the booms and
raise/lower each boom and main section. If one or more of these functions do not work, review the
hydraulic and electrical portions of this manual to check for proper installation.
2. Confirm that the cabling/hoses are at agreeable lengths for the entire range of motion.
3. Prepare the spray boom for the software installation.
Unfold the booms and level to 90 cm (or 35 inch) nozzle height. Ensure the boom slant is in its
centered position.
At this point ensure the UC4+ sensors are reading from an adequate and uniform target, such as
gravel or dirt. Do not attempt to perform the installation over grass or crop.
If the installation is done over concrete, place carpet beneath the sensors to avoid sensor
problems during the installation.
4. Switch on the UC4+ control panel and select the HD5 sprayer type.
5. At this point two install options are available:
a. Complete Install- this will setup the entire AutoSlant system, requiring fully range of boom
moment. Hydraulics will be calibrated to the hydraulic power unit connected. To perform a
complete install press “Yes” and follow the on screen instructions.
b. Quick Install- this will require the boom to be unfolded at 90cm spray height but no hydraulic
movement will occur (hydraulic calibration will occur at a later time by performing a “Retune” on
the final hydraulic power unit. To perform a Quick Install, press and hold the “Yes” switch until
“SENSOR” appears on the screen and release. Follow the on screen instructions.
Refer to the UC4+ Operators Manual for more detail.