1 general installation instructions using 44658-51 – NORAC UC4+BC+HD5 Part 1 User Manual
Page 20
16
4.4.1 General Installation Instructions using 44658-51
Figure 17: Cable Routing Overview (using 44658-51)
1. Connect the UC4 power cable (C10) to the UC4+ Control Panel in the cab. Ensure that both plugs
(P16 and P4) are connected to the panel (Figure 17).
2. Route the 22-pin AMP receptacle (R22) of C10 to the exterior of the cab.
3. Connect the 22-pin AMP plug (P22) of the extension cable (C11) to R22 of C10 (Figure 17).
Connect at the hitch. This connection will provide your hitch disconnect.
4. Run cable C11 from the hitch to the rear of the sprayer.
5. Install the sensor branch cable (C02) along the boom between the ultrasonic sensors. Be sure to
route the cable through the boom to avoid damage to the cable during field operation or boom
folding. Connect cable C02 to cable C11. One 4-pin round connector on C11 will remain unused.
6. Route the 6-pin and 4-pin tower connectors (T6 and T4) of C11 in the vicinity of the Job-com box.
Ensure power to the Job-com is turned off.
7. If the sprayer uses one forward/reverse valve and a number of cartridge valves (HARDI DH) turn on
the DIP switch of C12A (Figure 18). Otherwise leave the switches OFF (HARDI DAH). There is
denotation on the switch. Turn BOTH switches either ON or OFF.