Unit separation for installation – Leslie Controls NYC Heat Exchanger User Manual
Page 18

Page 18 of 25
Water 
temperature 
fluctuates or is 
colder than 
required 
Blockage in condensate line causing condensate to back up into 
heat exchangers. 
Gain adjusters not adjusted correctly 
Check the temperature of heat 
exchanger outside casing. If top is hot 
and bottom is warm or cold, shut unit 
off and check draining of condensate. 
Water 
temperature 
can not be 
maintained at 
120 F 
Solenoid valves were back pressured and solenoid plug is 
blocking flow. 
Shut down unit, disassemble and 
inspect solenoid units. 
Water was drained from system and tubing to differential 
pressure switch was not bled of air. 
Run pump and then loosen inlet 
compression fitting and bleed line until 
all air is out of line. Do same with 
outlet compression fitting. 
Pump 1 or 
Pump 2 Light 
is lit and No 
Flow light is 
on. Can see 
Pump is 
turning and 
water is re-
circulating. 
New differential pressure switch installed.
Run pump and then loosen inlet 
compression fitting and bleed line until 
all air is out of line. Do same with 
outlet compression fitting. If light is 
still on then adjust pressure switch 
according to manufactures instructions. 
UNIT SEPARATION FOR
INSTALLATION
 
To get unit into building may require separating the unit 
into two parts. The following instructions are to be used as 
a guide to separating the unit. 
 
1. Remove steam header from the unit and place aside 
protecting the flange face from damage. 
 
 
2. Remove Aquastats by removing cover and loosening 
clamp screw that holds thermostat to well. 
 
Note: Thermostat can be hung off of unit but be
careful to not disturb heat conductive compound on 
thermostat bulb. 
 
 
 
 
 
 
 
3. Undo copper water supply unions. 
