LAARS EDN Series - Installation, Operation and Maintenance Instructions User Manual
Page 5

Endurance
Page 5
Figure 4. Part number 2400-326 for vent installations which require adjustable height and horizontal run. This kit
provides vertical and horizontal lengths of pipe from 2' to 3½' (0.6 to 1.1m). To adapt 2400-278 (vent terminal extension)
remove 3" screen section of telescoping piece. Companion section will directly fit extension.
Figure 3. Part number 2400-500 provides all of the required venting materials for appliance installations adjacent to an
outside wall and for installation of wall mounted units. Requires minimum above unit clearance of 13" (330mm) and
provides maximum horizontal length of 24" from unit center line to outside wall face.
This manual is related to the following products:
See also other documents in the category LAARS Water boiler:
- LCH504T - Installation Manual (30 pages)
- Combi Heat TTW - Installation Manual (45 pages)
- Custom ASME Storage Tanks - Installation Manual (1 page)
- EBP 110 MBTU/h - Installation, Operation and Maintenance Instructions (40 pages)
- IGE-199R - Installation Manual (44 pages)
- IGE-199R-10(N,X) - Service Manual (60 pages)
- IGI-180R - Installation Manual (68 pages)
- IGI-180R-10(N,X) - Service Manual (64 pages)
- EverHot (interior) Venting Components - Installation Manual (16 pages)
- Heat Exchanger - Installation Manual (1 page)
- Gateway RER - Manual (33 pages)
- INDIRECT-FIRED - Installation, Operation and Maintenance Instructions (36 pages)
- M4-LHS - Installation Manual (55 pages)
- MagnaTherm MGH - Installation, Operation and Maintenance Instructions (104 pages)
- Mascot LX MLXH 50 MBH - Install and Operating Manual (56 pages)
- MC4EXT - Install and Operating Manual (4 pages)
- Mighty Stack MS-080 (Sizes 199, 300, 399) - Install and Operating Manual (36 pages)
- Mighty Therm HH-PH (Sizes 175-400) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW-PW (Sizes 175-400) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm AP (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (20 pages)
- Mighty Therm HH (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm VW (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm AP (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm HH (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm2 MT2H (Sizes 500–2000 MBTU/h) - Install and Operating Manual (40 pages)
- Mighty Therm2 MT2H (Sizes 200, 300, 400) - Install and Operating Manual (42 pages)
- Mighty Venter MV1 (Sizes 175-400) - Install and Operating Manual (12 pages)
- Mighty Venter MV2 (Sizes 500-1825) - Install and Operating Manual (12 pages)
- Mighty Therm2 MT2P (Sizes 500–2000 MBTU/h) - Install and Operating Manual (32 pages)
- Mini-Therm JVH (Sizes 50-225) - Install and Operating Manual (40 pages)
- Multi Flue CF-38-3 - Install and Operating Manual (16 pages)
- NeoTherm LC NTH1000 - Install and Operating Manual (140 pages)
- NeoTherm LC NTH (Sizes 1000-1700 MBTU/h) - Installation Manual (6 pages)
- NeoTherm NTH (Sizes 285–850 MBTU/h) - Installation Manual (4 pages)
- NeoTherm NTH (Sizes 080–285 MBTU/h) - Service Manual (110 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Start Up Guide (16 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Install and Operating Manual (92 pages)
- NeoTherm NTH (Sizes 399-850 MBTU/h) - Service Manual (118 pages)
- Pennant PNCP - Install and Operating Manual (40 pages)
- Pennant PNCH (Sizes 500-2000) - Install and Operating Manual (64 pages)
- Pennant PNCH - Install and Operating Manual (44 pages)
- Rheos RHCH - Install and Operating Manual (60 pages)
- Rheos Side-Wall Ducted Combustion Air Terminal - Service Manual (1 page)
- Rheos Side-Wall Vent Termination - Service Manual (1 page)