6.2 Unpacking and placement
CAUTION
Danger for the back!
The weighing system is quite heavy. Always use an
according lifting device to lift it out of the packaging or
to transport it to the required placement site
Unpacking:
Remove the outer packaging.
Lift the weighing system off the packaging material, see note of caution.
Secure the weighing system that it cannot fall down when it is lifted.
Make sure that the contents of the packaging is complete.
Scope of delivery:
• U-weighing bridge with assembled connection cable
• 4 weighing cell feet
• Instruction Manual
Placing:
Make sure that the surface of the placement site, especially around the weighing cell
feet, is even. Small unevenness can be offset by adjustment of the weighing cell feet.
Before a final placement install the four weighing cell feet. For transporting lift-off
the handle and move it on the conveyor rollers.
Settle down the weighing system and check if it is positioned evenly and all the
four feet touch the floor. Remove the covering screw and carry out adjustment if
necessary by turning the adjustment screw on the four weighing cells.
Position adjustment screw of the weighing cell
feet
Position of weighing cell
Make sure that during lifting and settling the connection cable is not squeezed or