beautypg.com

Honeywell vs8421, Troubleshooting – Vermont Casting NVC43 User Manual

Page 16

background image

16

NVC Series B-Vent

20000194

Remove glass door before service work

Honeywell VS8421

START

CHECK

Gas Supply On

Pilot Lights With Piezo
Ignitor

Lockout Has Engaged. Wait 60
Seconds And Try Again.

For Spark At Electrode While
Depressing Piezo

1/8" Gap To Pilot Hood Needed.

All Wiring Connections

Replace Piezo Ignitor

Supply Line Hooked Up

Shutoff Valve Open

Pilot Stays Lit

For Air In The Lines

Thermopile Needs A Min.
325mv. Adjust Pilot Flame
Height.

All Wiring Connections

Replace Thermopile

Thermocouple Needs A Min. Of
14mv

Defective Valve. Turn To Pilot,
Meter Should Read Greater
Than 100mv. If Not, Replace.

Pilot Lights Main Burner

Valve Is Turned On

Wall Switch Is Not Turned On.
Watch For Grounded Wires!

Thermopile Needs A Min. 325mv.

Plugged Burner Orifice

System Ok

Troubleshooting

YES

YES

YES

YES

NO

NO

NO

NO