Site preparation, Precautions – Hardy HI HLPT Tension Load Points User Manual
Page 8
HI HLPT SERIES LOAD POINT ASSEMBLY
Page 2
tory, such damage is normally the responsibility
of the carrier and should be reported to them.
•
LOAD SENSOR CERTIFICATION SHEETS
ARE AVAILABLE 24 HOURS A DAY AT
OUR WEBSITE: http://www.hardysolu-
tions.com
•
Write down the serial number(s) on the inside of
the back cover for reference when talking to
Hardy Customer Service. Store this information
in a secure dry location for future reference.
Site Preparation
•
All mounting surfaces for the base and loading
plate must be level. The Load Point Assemblies
in a system must be level to within +/- 0.5
o
.
•
Any welding should be done prior to installation
of the load points.
Precautions
•
Always treat the Load Sensor as a precision
instrument. Leave the load point assembly in its
packaging until it is time for installation.
•
NEVER CARRY OR SWING THE LOAD SEN-
SORS BY THEIR CABLE.
•
Never allow moisture to get into any interconnec-
tions.
Basic Engineering
Principles for
Positioning Load
Point Assemblies
•
Load Points Assemblies should be positioned
such that the load (weight) is distributed as
evenly as possible between each load point
assembly in the scale.
•
When the installation does not allow even distri-
bution of the load, select higher capacity load
point assemblies. This does not effect the weigh-
ing accuracy of the scale.
•
All load point assemblies must have the same
capacity when used in one scale.