beautypg.com

Site preparation, Precautions – Hardy HI HLPT Tension Load Points User Manual

Page 8

background image

HI HLPT SERIES LOAD POINT ASSEMBLY

Page 2

tory, such damage is normally the responsibility

of the carrier and should be reported to them.

LOAD SENSOR CERTIFICATION SHEETS
ARE AVAILABLE 24 HOURS A DAY AT
OUR WEBSITE: http://www.hardysolu-
tions.com

Write down the serial number(s) on the inside of

the back cover for reference when talking to

Hardy Customer Service. Store this information

in a secure dry location for future reference.

Site Preparation

All mounting surfaces for the base and loading

plate must be level. The Load Point Assemblies
in a system must be level to within +/- 0.5

o

.

Any welding should be done prior to installation

of the load points.

Precautions

Always treat the Load Sensor as a precision

instrument. Leave the load point assembly in its

packaging until it is time for installation.

NEVER CARRY OR SWING THE LOAD SEN-

SORS BY THEIR CABLE.

Never allow moisture to get into any interconnec-

tions.

Basic Engineering
Principles for
Positioning Load
Point Assemblies

Load Points Assemblies should be positioned

such that the load (weight) is distributed as

evenly as possible between each load point

assembly in the scale.

When the installation does not allow even distri-

bution of the load, select higher capacity load

point assemblies. This does not effect the weigh-

ing accuracy of the scale.

All load point assemblies must have the same

capacity when used in one scale.