beautypg.com

Cub Cadet RZT 22 User Manual

Page 23

background image

19

14.14.Carefully release the tension on the deck lift

handle torsion spring. See Figure 14.14.

NOTE: Putting the deck lift handle in the lowest
cutting position will make this task much easier.

14.15.Remove the E-clips on the ends of the deck lift

shaft. See Figure 14.15.

14.16.Remove both hex flange bearings.

Figure 14.14

Torsion spring

Figure 14.15

Deck lift shaft

14.17.Place a piece of 2 x 4 or something equivalent

under the front, left side of the seat box frame.
This will allow enough clearance for deck lift
assembly to slip out the back easily.
See Figure 14.17.

14.18.Shuffle the deck lift assembly to the left till the

right side falls out of the seat box.

14.19.From this point the deck lift shaft and deck lift

handle will slip of the rear of the unit where the
battery was. See Figure 14.19.

NOTE: The outer hex flange bearing on the deck
lift shaft can be replaced with out removing the
shaft.

NOTE: The split flange bearing on the deck lift
handle can be replaced with out removing the
deck lift shaft or deck lift handle.

Figure 14.17

2 x 4 or equivalent

Figure 14.19

Deck lift shaft