beautypg.com

Shutdown, storage, transport and disposal 9.1, Preparing the instrument for transport, 9shutdown, storage, transport and disposal – BUCHI KjelFlex K-360 User Manual

Page 58

background image

9 Shutdown, storage, transport and disposal

58

KjelFlex K-360 Operation Manual, Version C

9

Shutdown, storage, transport and disposal

This chapter instructs how to shut down the instrument, how to pack it for storage or transport, and
specifies the storage and shipping conditions.

9 .1

Preparing the instrument for transport

Take out the power cord and remove all water/reagent hoses. Rinse the sodium hydroxide pump/
reagent pump/boric acid pump hose with distilled water. Clean the instrument thoroughly, so that all
chemical residues are removed completely.

!

WARNING

Death or serious injuries by electric shock.

Switch off the instrument and remove the power cord.

Do not bring any electrical component into contact with fluids.

Do not operate the instrument when enclosure is open or removed.

!

CAUTION

Risk of burnings by hot machine parts and water steam.

Let the system and the steam generator cool down for 30 minutes before performing any

service.
Do not operate the instrument when enclosure is open or removed.

!

WARNING

Death or serious burnings by flammable vapors.

Remove all sources of flammable vapor.

Avoid spark formation.

Do not operate with open flames.

!

WARNING

Serious chemical burnings by corrosives.

Observe supplementary data sheets of all used chemicals.

Wear protective goggles.

Wear protective gloves.

Wear protective clothing.

To empty the steam generator, proceed as follows:

Turn off the instrument.

Let the steam generator cool down for 30 minutes.