Putting into operation 5.1, Installation site, Electrical connections – BUCHI KjelFlex K-360 User Manual
Page 23: 5putting into operation
5 Putting into operation
23
KjelFlex K-360 Operation Manual, Version C
5
Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedia-
tely to inform the postal company, railway company or transportation company.
Keep the original packaging for future transportation.
5 .1
Installation site
Install the instrument on a clean, flat and stable base and place the tanks for chemicals beside the
instrument (not higher and not more than 1 m lower).
Notice
Reduced instrument safety and lifetime due to improper handling and installation location.
Do not place any object on top of the instrument.
•
Keep a free safety space of 30 cm around the instrument.
•
Do not place items behind the instrument.
•
Do not operate the instrument within an fume cabinet.
•
5 .2
Electrical connections
L
N
IEC-60320, Type: C13
Fig. 5.1: Electrical connections
!
WARNING
Death or serious burnings by electric shock.
Mains voltage must match the voltage reading on the type plate.
•
Instrument must be earthed by the mains socket.
•
Only use a molded 3-pole device plug (IEC-60320, type C13 or C15).
•
Do not use damaged cables.
•