beautypg.com

5 putting into operation, 1 installation site, Putting into operation 5.1 – BUCHI Encapsulator B-390 User Manual

Page 19: Installation site, 5putting into operation

background image

5 Putting into operation

19

B-390

Operation Manual, Version C

5

Putting into operation

This chapter describes how the instrument has to be installed. It also gives instructions for the initial
startup.

NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report imme-
diately to inform the postal company, railway company or transportation company. Keep the original
packaging for future transportation.

5 .1

Installation site

Put the instrument on a stable, horizontal surface. Consider the maximum product dimensions and
weight. The instrument must be set up in such a way that the main switch and the mains plug are
easily accessible at all times.
Obtain the environmental conditions as described in section 3.2 “Technical data”.

!

Warning

Death or serious injuries by use in explosive environments.
• Do not operate the instrument in explosive environments.

!

Warning

Death or serious poisoning by contact or incorporation of harmful substances.
• Wear safety goggles.
• Wear safety gloves.
• Wear a laboratory coat.
• Clean the instrument and all accessories thoroughly to remove possibly dangerous

substances.

• Do not clean dusty parts with compressed air.
• Store the instrument and its accessories at a dry place.